Bridge construction

The tower foundations may be constructed using caisson or cofferdam techniques, whilst the cable anchorages can be secured through anchorage tunnels to

Contact Us

Bridge Design Guide

Use slab dowels to provide lateral restraint when constructing U-beams with inverted-tee bents. These dowels are located at the top of the inverted-tee stem and are in a slotted pipe to allow for expansion

Contact Us

Fatigue Strength of Joints in a Precast Prestressed Concrete Double Tee

Nevertheless, with large load require ments, coupled with more slender structural members and higher work ing stresses, there is a need to check the fatigue behavior and ultimate strength of longitudinal

Contact Us

Longitudinal Joints with Accelerated Construction Features in Decked

Comparing with the current longitudinal joint with welded steel connectors, an improved joint detail should control joint cracking better, and maintain the accelerated construction features.

Contact Us

Twelve high voltage cable construction techniques used worldwide

This technical article discusses twelve different methods for laying high voltage cables. Out of the ten, four are deemed

Contact Us

Full-scale testing of non-proprietary ultra-high performance concrete

The Accelerated Bridge Construction (ABC) techniques have paved the way to offer viable and rapid solutions for bridge deck replacements. The use of full-depth precast deck panels is

Contact Us

Review and analysis of RC bridge half-joints strengthening techniques

In the past, the extensive use of the Gerber scheme in the construction of existing bridges has been justified by the advantages in terms of reduced s

Contact Us

Development and study of deck joints in prefabricated concrete bulb-tee

It was concluded that the type and detailing of the deck slab joint affected the ultimate load carrying capacity of the developed connections. The successful connection systems can be used by

Contact Us

Longitudinal joint in decked bulb‐tee beams for accelerated bridge

Accelerated bridge construction (ABC) techniques have gained prominence due to their potential to minimize construction time and traffic disruptions while enhancing sustainability. This

Contact Us

Microsoft Word

A 4-hour workshop was also developed as part of this project. Key words: longitudinal joint, paving, density, permeability, air voids, hot-mix asphalt Best Practices for Constructing and Specifying HMA

Contact Us

Guidance for Choosing and Detailing Bridge Expansion Joints to

Overview Over the past few years there have been numerous premature expansion joint header or seal failures on expansion joints installed on new or rehabilitated bridges. Many times,

Contact Us

Development and study of deck joints in prefabricated concrete bulb

The paper presents design procedure of the developed joints based on available design equations in North American design codes for bridges and structures as well as related design equations

Contact Us

Longitudinal Joints between Deck Bulb Tee Girders Made with

Abstract Highway bridge superstructures may be built using only precast concrete elements, such as deck bulb tees (DBTs). Formerly flange connections between those members

Contact Us

People also like: