STEEL ETHIOPIAN CONSTRUCTION

Cable tray construction at a steel plant in Kenya

Cable tray construction at a steel plant in Kenya

Manufacturers produce galvanized cable tray units using high-quality steel materials. Our cable trays are designed to support and organize your cables efficiently, ensuring safety and ease of maintenance. Therefore, developers rely on these systems in commercial and industrial buildings. After being incorporated in 1986, SUPER STEEL INDUSTRIES changed its name to SUPER CABLE TRAY PVT. Being one of the top players in Cable Tray Manufacturing in Kenya, though we are based in Delhi, we provide sturdy and simple-to-install cable trays.

Read More
Singapore Bridge Construction

Singapore Bridge Construction

Singapore's skyline is set for another striking addition as the Urban Redevelopment Authority (URA) prepares to launch the Marina Centre-Bay East Bridge project. This pedestrian and cyclist link across the Marina Channel is scheduled to begin construction in Q1 2026 and be completed. The bridge, to be located near Block 410 Jurong West Street 42, measures 10m long and 5m wide. Singapore will build its first 3D-printed concrete pedestrian bridge over Jurong River by 2028, connecting Jurong West and Tengah town. This blueprint launched on June 26, 2025, outlines development goals for the next 10 to 15 years prioritising liveability, sustainability.

Read More
Norway IDC Data Center Construction Plan

Norway IDC Data Center Construction Plan

Nordic Data Center project is advancing a large-scale construction program targeting 500MW capacity across Norway and wider Nordic regions. The project aims to leverage hydropower-rich locations while accelerating hyperscale infrastructure delivery. Originally published by: Digitaliserings- og forvaltningsdepartementet Norway aims to be an attractive destination for data center establishments that contribute to overall value creation, enhanced national security, and the safeguarding of Norwegian interests.

Read More
Temporary secondary standard power distribution box at the construction site

Temporary secondary standard power distribution box at the construction site

This article explains how temporary construction power boxes work, the key components involved, and how E-abel portable electrical enclosures combined with industrial connector systems enable efficient, safe, and scalable power distribution for construction projects. However, exposure to weather, frequent relocation, rough use and other condi-tions not normally encountered with conventional wiring systems necessitate special consideration not require in other applications or in completed structures. Without a safe and high-performance supply, machines, tools, and infrastructure come to a standstill – from the hydraulic power pack for hydraulic splitters through concrete. Temporary power distribution boxes provide a safer way to manage power while keeping your workspace tidy. These versatile units work great for construction sites, entertainment events, and disaster recovery operations. They define a mini um baseline of quality and workmanship for installing electrical products and systems. NEIS® ar intended to be referenced in contract ntractors Association assumes no obligation or liability to.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain