GUIDE TO SPECTROSCOPY AND SPECTRAL LINES

Introductory Guide to Relay Protection Commissioning

Introductory Guide to Relay Protection Commissioning

This paper suggests a process for performing consistent and thorough commissioning tests through many sources: breaking out relay logic into schematic drawings; using SER, metering, and event reports from relays; simulating performance using end-to-end testing and lab. This happens because the main function of protection devices is related to operation under fault conditions so these devices cannot be tested under normal operating conditions. Abstract—Performing tests on individual relays is a common practice for relay engineers and technicians. As a Relay Protection Engineer, your work in relay testing and commissioning is critical to ensuring system safety and continuity.

Read More
Several grounding points for communication tower feeder lines

Several grounding points for communication tower feeder lines

The fundamental objective of this document is to provide guidelines and practices for Ericsson site equipment grounding, with recommended methods that are essential to protect personnel, minimize component failure, and optimize performance by reducing electrical noise. #2 AWG minimum bare tinned solid copper ground wire may be used to bond air terminals to the tower. Because bonding and grounding systems within a building are intended to have one electrical potential, coordination between electrical and telecommunications bonding and grounding systems is essential during design and installation. It can enter via the feeder screens that are grounded at the top of the tower, via surge protective devices within or external to tower mounted electronics, via side flashing to exposed connection points and other electrical mechanisms.

Read More
Construction process of overhead optical cable lines

Construction process of overhead optical cable lines

The construction procedures of general optical cable lines are mainly divided into five stages: preparation, laying, connection, testing and completion acceptance. (FOA) was founded in 1995 to help develop the workforce to build the fiber optic networks to support a rapid expansion in communications and the Internet. In case of special sections, crossing obstacles or roads or railways, the pole height of 8m, 9m, etc.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain