96 meter for type 2 to provide adequate working space and facilitate the opening/removal of the meter box covers for installation and maintenance. The proper installation of a distribution box involves placing it at the right height to ensure safety and convenience. STEMC shall provide transformer pads, econdary vaults, communication vaults and cable. Energy Networks (SPEN) technical requirements for the civil design and construction of existing and n be used without alteration for all such works therefore certain parts may not be applicable to all secondary substation construction types. The body of the boxes shall have sufficient re- enforcement with suitable size of channels keeping a provision for fixin andle conforming to general. Conduit is required when cable will pass under existing pavement, sidewalks, driveways, etc.