DATA CENTER CONSTRUCTION CUSTOMIZED HIGH END DATA

Customized Modular Data Center High Density

Customized Modular Data Center High Density

Explore our pioneering modular systems engineered for extreme density, rapid deployment, and ultra-efficient operation. Fast-track your infrastructure deployments—up to 180 MW capacity delivered within weeks at a fraction of conventional construction costs. Built for demanding sites and on-prem workloads, our prefabricated modular data center solutions deliver 5–150 kW per rack. Leveraging over 20 years of expertise and partnerships with leading component manufacturers, we deliver customized, scalable.

Read More
Construction of IDC Data Center in Congo

Construction of IDC Data Center in Congo

The Republic of Congo's National Data Center in Brazzaville has reached 75% completion. The African Development Bank will fund the building of a data center in Brazzaville, the Republic of Congo. Congo-Brazzaville faces, like many African countries, a crucial challenge: that of infrastructure linked to artificial intelligence.

Read More
Case Study of DC Power Supply Unit Construction in Nigerian Data Center

Case Study of DC Power Supply Unit Construction in Nigerian Data Center

ABSTRACT: This work developed a 110 V direct current (DC) auxiliary supply unit for power system protection application in Nigeria. The new facility was also designed to link with the customer's cable landing station in Ni ustomer sought a rapidly deployable data centre solution. The planned site for the new data centre was long and narrow and covered three floors.

Read More
Data Center Rack Bundling Methods

Data Center Rack Bundling Methods

In this blog, we'll walk through the standard procedures for installing racks and assembling MPO systems in modern data centers. Rack placement must consider airflow, power distribution, cable routing, and physical. Top and bottom feeds are routed into a rack in much the same way, with the largest difference being that for top feed the first bundle to be run should correspond to the topmost switch or switch line card and for bottom feed the first bundle should be the bottommost switch or switch line card. Server racks, far from being simple metal frameworks, provide the vital infrastructure for arranging, cooling, securing, and supporting all computing hardware and networking devices. Two key components of a high-performance data center are the rack system and the MPO (Multi-fiber Push-On) cabling.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain