CONSTRUCTION OF STC DATA CENTER BAHRAIN PROJECT

Norway IDC Data Center Construction Plan

Norway IDC Data Center Construction Plan

Nordic Data Center project is advancing a large-scale construction program targeting 500MW capacity across Norway and wider Nordic regions. The project aims to leverage hydropower-rich locations while accelerating hyperscale infrastructure delivery. Originally published by: Digitaliserings- og forvaltningsdepartementet Norway aims to be an attractive destination for data center establishments that contribute to overall value creation, enhanced national security, and the safeguarding of Norwegian interests.

Read More
Internet Data Center Construction Standards

Internet Data Center Construction Standards

The international standard ISO/IEC 22237 provides comprehensive guidance on the planning, construction, and operation of data centers to ensure their physical security and availability. Data center design and infrastructure standards can range from national codes (required), like those of the NFPA, local codes (required), like the New York State Energy Conservation Construction Code, and performance standards like the Uptime Institute's Tier Standard (optional). Uptime Institute introduced the Tier Standards which is a performance-based rating system. Since its inception in 2005, it has become the go-to resource for data center designers.

Read More
Romanian Internet Data Center Project

Romanian Internet Data Center Project

Citing Knight Frank data, the Ziarul Financiar reports two new data centers totaling 40-45MW are set to be built in Romania. Romania's central-eastern European location offers rapid connectivity to both Western and Central Europe, making it ideal for latency-sensitive and multi-region redundant deployments. Land, construction, and labor costs remain significantly lower than in the Nordics, Netherlands, or Ireland. In the South-Muntenia region of Romania, a new data centre will consolidate hundreds of fragmented government IT systems, boost digital security and improve services for nearly 300,000 people. The plan is structured around six pillars: the green transition, digital transformation, smart growth, social and territorial cohesion, health and resilience, and policies for the next generation. Two new data centers with a cumulative power of 40-45 MW are considered by developers to be built in Romania, meaning total investments of almost EUR 500 million, according to data from real estate consulting company Knight Frank, quoted by Ziarul Financiar. The Romania Data Center Market Report is Segmented by Hotspot (Bucharest, Cluj-Napoca, Rest of Romania), Data Center Size (Small, Medium, Large, Mega, Massive), Tier Type (Tier I and II, Tier III, Tier IV), and Absorption (Non-Utilised, Utilised).

Read More
Case Study of DC Power Supply Unit Construction in Nigerian Data Center

Case Study of DC Power Supply Unit Construction in Nigerian Data Center

ABSTRACT: This work developed a 110 V direct current (DC) auxiliary supply unit for power system protection application in Nigeria. The new facility was also designed to link with the customer's cable landing station in Ni ustomer sought a rapidly deployable data centre solution. The planned site for the new data centre was long and narrow and covered three floors.

Read More
What are the uses of an energy big data center

What are the uses of an energy big data center

In 2025, data centers evolved from passive utility customers to active energy planners, investing in on-site generation, battery storage, and flexible demand to serve AI compute and hit sustainability targets. Data centres are a vital infrastructure supporting our ever-growing use of cloud storage, social media, AI, streaming services and more. A data center typically contains multiple computer servers, data storage devices, and network equipment that can provide information technology (IT) infrastructure service for organizations to store, manage, process, and transmit large amounts of data. Energy-efficient AI, battery storage systems, and renewed interest in nuclear have reshaped how data centers generate, consume, and manage energy. A new report from the IEA assesses how the relationship between energy and artificial intelligence (AI) is evolving rapidly, drawing on the latest data and analysis and close tracking of technological and economic developments in the AI sector. Projections indicate this share could roughly double by 2030, with the pace of expansion well beyond what was anticipated only a few years ago.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain