BUSBAR TESTING HIPOT TESTING PARTIAL DISCHARGE

Power Plant Relay Protection Testing Procedure

Power Plant Relay Protection Testing Procedure

One approach to test the total protection system is to use primary injection techniques (see appendix H) that trigger protective relays and lockout relay, trip circuit breakers, and initiate annunciations and indications. Protective circuit functional testing, including lockout relay testing, must take place immediately upon installation, every 2 years thereafter, and upon any change in wiring. If applicable, documentation is required detailing how verified protection segments overlap to ensure there is not a gap. But failure to operate as intended can result in extensive damage, extended power outages, and loss of life.

Read More
Fiber Optic Patch Cord Testing Process Requirements

Fiber Optic Patch Cord Testing Process Requirements

In this blog post, we'll take a deep dive into the key performance tests for fiber optic patch cords — polarity verification, insertion loss and return loss measurement, 3D interferometric endface metrology, and endface inspection — along with the relevant standards, equipment . This Applications Engineering Note (AEN 135) explains and recommends standard measurement methods for characterizing optical fiber system performance. This note also provides background information on system link configurations, test equipment and system component considerations that influence. Their performance directly impacts signal quality, insertion loss (IL), and return loss (RL). FOA "Quickstart Guides" are short, simple guides to basic fiber optic tests.

Read More
Testing the condition of wiring in a distribution box

Testing the condition of wiring in a distribution box

Check the electrical load and ensure that the sensors do not exceed the 10 Amp maximum. A good understanding of the one-line helps and as technology has evolved to virtualization and the one line is becoming more prevalent. Most electrical failures inside distribution panels do not start with overloads or short circuits—they start with connectors that were "installed once and forgotten. LV intrusive switchboards accept power from the utility & generator & distribute it to building circuits.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain