BRIDGE SCAFFOLDING SOLUTIONS FOR CONSTRUCTION SAFETY

Singapore Bridge Construction

Singapore Bridge Construction

Singapore's skyline is set for another striking addition as the Urban Redevelopment Authority (URA) prepares to launch the Marina Centre-Bay East Bridge project. This pedestrian and cyclist link across the Marina Channel is scheduled to begin construction in Q1 2026 and be completed. The bridge, to be located near Block 410 Jurong West Street 42, measures 10m long and 5m wide. Singapore will build its first 3D-printed concrete pedestrian bridge over Jurong River by 2028, connecting Jurong West and Tengah town. This blueprint launched on June 26, 2025, outlines development goals for the next 10 to 15 years prioritising liveability, sustainability.

Read More
South Sudan Bridge Construction

South Sudan Bridge Construction

Some of the grants were used for the construction of a new bridge over the to relieve traffic congestion in and improve the transportation capacity and connectivity of. The new proposed Freedom Bridge funded by (JICA) would be 560 meters long with sufficient width for both east and we. Juba Bridge, probably one of South Sudan's oldest and most important infrastructures still stands strong and serves the landlocked nation despite clocking half a century since its construction partly with funding from the Kingdom of Netherlands. South Sudan, which gained independence from Sudan in July 2011 after many years of conflict, faces a serious lack of social and economic infrastructure.

Read More
Panama Bridge Construction

Panama Bridge Construction

Construction of the Fourth Bridge over the Panama Canal has officially resumed at 100% capacity following a strike by construction workers. The strike, which began in late April 2025, temporarily halted several important infrastructure projects managed by Panama's Ministry of Public. 42 billion project was awarded to the Chinese consortium in 2018 by the government of Juan Carlos Varela and was scheduled to be completed in 2023. This was informed by the head of the Ministry of Public Works (MOP), José Luis Andrade, during a recent tour.

Read More
Vanuatu Bridge Construction Project

Vanuatu Bridge Construction Project

Reconstruction of the Teouma Bridge on Efate will now officially begin following its ground-breaking ceremony yesterday on Friday 19th April 2024 Valued at over a billion, the project is expected to be completed by September 2025, through funds from the Japanese Government. The previous bridge was badly damaged by Cyclone Pam in 2015 and subsequent disasters, with heavy flooding at. als concerned of the Government of the Republic of Vanuatu, and conducted Efate Island where the capital of the Republic of Vanuatu is lo ated live along the Ring Road. The longest bridge in Vanuatu will be built in South Santo, at the Navaka River, as part of the South Santo Road Project, which is funded by the World Bank. This was confirmed by the China Civil Engineering Construction Corporation (CCECC), which also confirmed that the bridge is designed as a.

Read More
Quotation for Communication Tower Construction

Quotation for Communication Tower Construction

Send an RFQ / RFI / RFP to Featured and Preferred suppliers with the capabilities to meet your needs. Your inquiry will be sent out by email to all qualified vendors within one business day. no cost, hassle, or obligation!Get a quote through IndustryNet for Communication Towers. This essential document serves as the foundation for network expansion initiatives, providing. Custom Tower is a nationwide leader in communication towers, offering expert services in tower manufacturing and installation, microwave installation, antenna mounting, and other critical infrastructure installation. Telecom tower pricing typically ranges from $15,000 to over $150,000 for the structure itself, heavily dependent on height, design type, and current global steel prices. As the industry leader in turn-key wireless cell tower construction and maintenance, BHI has you covered.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain