5TH THAI LAOS BRIDGE TO BOOST TRADE TO OVER 28 BILLION BAHT

Access switch with 28 gigabit ports

Access switch with 28 gigabit ports

This 28-port multi-Gigabit access switch is the ideal solution for data-intensive infrastructures. Software Defined Networking (SDN) with Cloud Access Remotely manage your access points, switches, and gateways across multiple sites all from a single interface. Requiring the use of Omada Hardware Controller, Omada Cloud-Based Controller, or Omada Software Controller. The D-Link DGS-1210 Series Smart Managed Switches are the latest generation of switches to provide increased Power over Ethernet (PoE) output, a range of physical interface types, multiple management interfaces, and advanced Layer 2 features. Full Gigabit Ports: 24× gigabit PoE+ ports and 4× gigabit SFP Slots provide high-speed connections. Integrated into Omada SDN: Zero-Touch Provisioning (ZTP) ***, Centralized Cloud Management, and Intelligent.

Read More
Source of Bahrain Grid Bridge

Source of Bahrain Grid Bridge

The project to build the bridge began during an official visit to Bahrain in 1954 by King Saud; his wish was to nurture and further solidify the bonds between the two countries. OverviewThe King Fahd Causeway (: جسر الملك فهد, : Jisr al-Malik Fahd) is a 25 km (15. 4, which, with a total area of 660,000 square metres (7,100,000 sq ft), is the largest of the embankments. On 6 July 2010, Saudi newspapers quoted King Fahd Causeway Authority chief Bader Abdullah Al-Otaishan as saying that the King Fahd Causeway was to undergo a major expansion projected to cost $5.

Read More
Palau Bridge Straight Bend

Palau Bridge Straight Bend

The Koror–Babeldaob Bridge is a bridge in Palau that connects Koror and Babeldaob Islands. It is a reinforced concrete, portal frame, cable-stayed bridge with a total length of 413 m.

Read More
Gantry Drive Bridge Support

Gantry Drive Bridge Support

Gantry cranes for bridge construction play a crucial role in both precast yards and on-site erection processes. They are designed to handle heavy girders safely and efficiently, streamline workflow, and improve productivity across the entire bridge project lifecycle. They enable precise positioning, especially in large workspaces, with travel distances of up to 1,500 mm and a repeatability of less.

Read More
Singapore Bridge Construction

Singapore Bridge Construction

Singapore's skyline is set for another striking addition as the Urban Redevelopment Authority (URA) prepares to launch the Marina Centre-Bay East Bridge project. This pedestrian and cyclist link across the Marina Channel is scheduled to begin construction in Q1 2026 and be completed. The bridge, to be located near Block 410 Jurong West Street 42, measures 10m long and 5m wide. Singapore will build its first 3D-printed concrete pedestrian bridge over Jurong River by 2028, connecting Jurong West and Tengah town. This blueprint launched on June 26, 2025, outlines development goals for the next 10 to 15 years prioritising liveability, sustainability.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain